Skip to content

Getting ready

Begin with one real workflow, such as a sales order, warehouse task or production order. Record who currently handles it, which documents are used and what the team needs to find after go-live. Then prepare the master data, people, network and terminals around that work.

Choose a real scenario that can be completed end to end, such as:

  • a sales order from acceptance to fulfillment;
  • a purchase request, receipt, putaway, and reconciliation;
  • receiving, picking, shipping, or counting in one warehouse;
  • one product, route, operation, and station on a production line;
  • publishing, reading, and acknowledging a controlled work instruction on a workstation;
  • a repair ticket from intake through handling and result confirmation.

Write down the start condition, owner, key records, completion condition and information to retain. Keep the first scope focused on one workflow so each role can find its handoff task and processing result.

Topic Confirm
Organizational scope Relationships between enterprise, legal entity, site, warehouse, line, store, or service point
Parties and people Customers, suppliers, operators, approvers, device administrators, and responsibilities
Products and items Product and revision, units, lot or serial rules, substitutions, and inspection needs
Starting records The order, purchase, stock, work order, quality, or repair records that begin the scenario
Access and approval Who can create, review, publish, execute, withdraw, or correct
Results and evidence Receipts, reports, approvals, images, or field records that must remain traceable

Start with samples from one part of the business and mark records that still need import or cleanup. A focused scope makes it easier to check each sample and handoff.

  • Confirm where the appliance or customer-side host will live, how it is powered, and which networks can reach it.
  • Confirm the management browser, enterprise identity approach, and administrator contact.
  • Agree backup location, retention, recovery owner, and a time to exercise recovery.
  • Register each workstation or equipment gateway by location, purpose, network method, and owner.
  • For ESOP, prepare the target product, route, operation, station, and controlled document revision.
  • For a display, prepare its location, data scope, owner, and the expected offline behavior.

Record the exact model, operating system and intended use of the equipment at the site. Before installation, compare them with the matching version’s installation article, supported targets and support matrix. Only targets listed for that version can be used as the installation and production support basis.

View delivery scope and fee conditions
  • Standard delivery includes standard deployment, basic master-data import and remote training at no additional charge.
  • Preparation is separate from the annual subscription term and does not consume subscription time.
  • A customer-supplied server must pass compatibility review. Once accepted, no delivery appliance is purchased and no appliance charge applies; the annual software fee is unchanged.
  • Light does not include a delivery appliance. Other editions default to appliance deployment, with hardware purchased separately from ¥1,000. A selected YOVAL appliance and any custom configuration are listed and quoted separately in the delivery proposal.
  • Non-standard migration, customization and additional on-site work are scoped separately.

Work instructions, process documents, inspection forms, and repair evidence should have a clear title, revision, and applicability. Before publication, check that:

  1. the content matches the product, route, and operation;
  2. the file is not a draft, retired revision, or demonstration file;
  3. operators can read the key steps, cautions, and result requirements;
  4. a change creates a traceable new revision;
  5. multiple files are distinguishable as primary or supplementary material at the station.

Before go-live, have business owners, administrators and operators run the complete workflow: create or import the starting records, perform the work, check the handoffs and exception/correction path, then find the result in the report, document and terminal views. If a page says “success” but the related record is missing, note the document number, time, operator and message, then ask the administrator to confirm the state before continuing.

Run one real order or production task from start to finish for the first rollout, then confirm that:

  1. Sales, purchasing, warehouse, production, quality, finance or support can find the task in their own workspace.
  2. The next person can see the document number, quantity, due date and current status.
  3. The completed flow shows shipment, receipt, putaway, work report, inspection, service or payment results.
  4. Withdrawn, corrected or cancelled work still shows the original record and reason.
  5. The management page, shop-floor terminal and report show the same latest status.

When contacting YOVAL, provide the scenario, enterprise and site scope, target roles, planned timing, terminal class, existing system boundary, and the question to resolve. Do not email passwords, maintenance PINs, Wi-Fi keys, private keys, access tokens, or complete production data.

The download center lists files and supported targets that have already been published. Contact hi@yoval.cc to check a version, device compatibility or hardware configuration that is not yet published.